right-click on any row for available actions | Showing documents 331-340 from a total of 444 | Show documents per page | Show only documents in status: |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Commenting / Reaction period (yyyy-mm-dd) | ||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Status
|
Task numbers | Title | Number | Affected rules & codes | Begin | End | ||||||||||||||||||||||||||||||||||||||||||||
RMT.0179 (E.009) | Turbine Engine Certification Specifications in Icing Conditions — Advisory Material | NPA 2012-23 | CS-E | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0058 (25.058) | Large Aeroplane Certification Specifications in Supercooled Large Drop, Mixed phase, and Ice Crystal Icing Conditions – Advisory Material | NPA 2012-22 | CS-25 | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0364 (MDM.089) | Volcanic ash ingestion in turbine engines | A-NPA 2012-21 | CS-E | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0559 (20.016) | Approval requirements for Air-Ground Data Link and ADS-B in support of Interoperability requirements | NPA 2012-19 | CS-ACNS | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0463 RMT.0547 | Part-M General Aviation Task Force (Phase I) | NPA 2012-17 | Part-145 Part-145 AMC/GM Part-M Part-M AMC/GM | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0186 (ETSO.008) | Systematic review and transposition of existing FAA TSO standards for parts and appliances into EASA ETSOs | NPA 2012-16 | CS-ETSO | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0135 (66.027(a)) RMT.0165 (66.027(b)) | B2L and L licences | NPA 2012-15 | Part-145 Part-145 AMC/GM Part-147 Part-66 Part-66 AMC/GM | |||||||||||||||||||||||||||||||||||||||||||||||
ATM.001(b) | Acceptable Means of Compliance and Guidance Material to Part-SERA | NPA 2012-14 | Part-SERA | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0110 (21.039(k)) | Additional Airworthiness Requirements for Operations | NPA 2012-13 | CS-26 Part-26 Part-ORO | |||||||||||||||||||||||||||||||||||||||||||||||
RMT.0327 (OPS.058(a)) RMT.0328 (OPS.058(b)) | Transfer of JAA cabin safety tasks’ | NPA 2012-12 | Part-CAT Part-CAT AMC/GM Part-ORO Part-ORO AMC/GM |